Corps says 2012 Missouri River Plan is Ready, Promise More Communication

OMAHA, Neb. (AP) — The Army Corps of Engineers says it is trying to improve the way it manages the Missouri River’s reservoirs after last year’s historic flooding, but the 2012 plan released Friday doesn’t include much additional flood-storage space.
The corps has been criticized by people living all along the river because of the way it managed last year’s flood that caused $630 million damage to flood-control structures and covered hundreds of thousands of acres of farmland along the 2,341-mile-long river for months.
The corps said it tried to address some concerns by promising to improve communication and react swiftly to signs of high runoff, but officials say there wasn’t time to clear much more space than normal in the reservoirs.
“The selected drawdown strategy was designed to evacuate stored flood water as quickly as possible to allow people to get back into their homes, farms and businesses to begin the process of recovery, and to allow inspection and repair of infrastructure including the dams and levees to ensure they are ready for the 2012 season,” the corps said in the plan.
Officials are studying whether the corps needs to increase the 16.3 million acre-feet of space that’s normally cleared out each spring for flood control purposes. That study won’t be completed until March, so it won’t affect this year’s plan, and even if the corps decides that more flood control space is needed, officials will have to examine how that would affect all the other purposes of the river that require more water: irrigation, navigation, hydroelectric power generation, water supply, water quality, recreation, and fish and wildlife enhancement.
Officials say the levees, dams and channels along the river remain vulnerable going into 2012 because many more repairs are needed, but they are working to complete critical repairs before spring.
In northwest Missouri where some of the worst flooding was last year, Holt County clerk Kathy Kunkel said she’s disappointed the corps won’t clear out more space in the reservoirs. Kunkel said she doesn’t expect all the 32 levee breaches in her county to be repaired before spring, so the area may flood after any significant rain.
“We’ve got to go back to what this system was designed for, and that’s flood control,” Kunkel said.
The corps said there is only a 10 percent chance that the amount of water flowing into the Missouri River from melting snow and rainfall this year will exceed the amount the plan can handle.
If this winter’s relatively mild weather continues, that would reduce flood concerns along the Missouri River but wouldn’t necessarily prompt changes in the corps’ management plan.

About these ads

There are no comments on this post.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 88 other followers

%d bloggers like this: